











AS Colour Wo's Curve L/S Tee 4055
- $40.00
- $40.00
- Unit price
- per
Price includes single-sided printing. An additional $10 (GST inclusive) will be charged for double-sided printing.
Couldn't load pickup availability
Free Shipping
Flat Rate Shipping $15 Australia Wide
Free Standard Shipping Australia Wide For Members
Printed And Shipped Within 5 - 7 Business Days
Description
xAS Colour Women's Curve L/S Tee – Lightweight, Flattering, and Print-Ready
Elevate your basics with the AS Colour Curve Long Sleeve Tee—designed with a flattering curved hem and a feather-light feel. Crafted from 150 GSM 100% combed cotton, this tee is breathable, durable, and made for comfort. Whether you're layering it or wearing it solo, it’s a perfect fit for everyday wear or custom branding.
Key Benefits:
- Lightweight Comfort: Ideal for year-round wear with a soft, breathable cotton finish
- Tailored for Women: Curved hem adds shape and style while keeping the fit casual and comfortable
- Perfect for Printing: Suited for screen printing, DTG, and embroidery, making it great for custom apparel
Product Highlights:
- Fit: Regular
- Fabric: Light weight, 150 GSM, 34-singles, 100% combed cotton (marles 15% viscose)
- Design Details: Self-fabric neck binding, shoulder-to-shoulder tape, side seams, double needle hems, curved hem
- Preshrunk: Helps maintain size and shape wash after wash
Size Guide
x
Shipping & Return
xShipping
We dispatch all orders from our facility in Hornsby, NSW and ship Australia-wide.
Please allow 3–7 business days for production of custom items before they are shipped.
- Standard Shipping: 2–7 business days
- Express Shipping: 1–3 business days (optional at checkout)
- Local Pickup: Free from our Hornsby location (you’ll be notified once your order is ready)
You will receive tracking information once your order has been dispatched.
Returns & Exchanges
Because our products are custom-made to order, we do not offer returns or exchanges for:
- Change of mind
- Incorrect selection (e.g. size, colour)
- Customer-submitted design errors
However, under the Australian Consumer Law, you are entitled to a replacement or refund if your item is faulty, damaged, or significantly different from what was described.
If there is a problem with your order, please contact us within 7 days of receiving it, and we’ll assess the issue promptly.
- ✔️ All items are quality checked before shipping
- ✔️ Replacements or refunds available for manufacturing defects or incorrect items under ACL
For any concerns, our customer service team is here to help.
Care Instrucitons
x- Machine wash cold with like colours.
- Do not bleach.
- Do not tumble dry.
- Do not dry clean.
- Do not iron if printed.
- Line dry in shade.
Related Products
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
Recently Viewed Products
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
- $40.00
- $40.00
- Unit price
- per
